Tel: 01483 750447

Manor Way Industrial Estate, Manor Way, Woking, Surrey

Rustlings, Guildford Surrey January 2008

In similar fashion a new large detached executive home (500 sq.m) was being built and the owner had asked the Contractor to install a GSHP. The main building works had proceeded to a point where it was being held up by the reluctance to proceed with GSHP because of similar cost and ground problems as for Apple Acre. We were asked to provide urgent proposals and in March 2008 we were instructed to proceed. We installed an Air to Water Heat Pump to power two floors of underfloor heating and all the hot water requirements of the 5 bedroom/ bathroom house. An Air to Air Heat pump was also installed to provide heating and cooling to the master bedroom and two further loft rooms. Both systems were successfully commissioned in April 2008 and are operating very well. The owners are delighted and have allowed us to use their home as a show piece to other potential customers. Not only did the ASHP save them a great deal of money but the ease of installation turned a delayed project into one which was completed in time.

Client Mr & Mrs Cole
Developer/Builder: Heather Developments Ltd
Architect: Richard Flowitt Partnership